The dumpster replacement at Buildings 2, 3, 6, and 14 has been delayed. Waste Management expects the change-out to occur within the next 10 days. The dumpster at Building 10 has been completed.
Once underway, the existing dumpsters will be removed so the vaults below can be inspected, cleaned, and repaired as needed. Temporary low-profile containers will be placed nearby during the work:
* Building 2: East of Building 2, near the exit gate
* Building 3: South of the existing dumpster location
* Building 6: West of the existing dumpster location
* Building 12: Please utilize the dumpster by building 13
We appreciate your patience and will work to complete the project as quickly as possible with minimum disruption.